Factors affecting plant design

LNG plants that aim to meet the needs of more than one market must have a flexible NGL recovery unit that is equipped with devices suitable for reinjecting heavy components into the gas to be liquefied. Hot selling small gold ore concentrating thickener equipment for mining.

On the other hand in case of intermittent or assembly industries, process type of layout best suited. Under this method different products are extracted from one material.

In case of job orders, production of non-standardized products are undertaken, and therefore functional or process outlet is suitable. It mainly deals with the movement of men and materials. Job production involves intermittent process as the work is carried as and when the order is received.

The people inside the room generate lots of heat. Special attention must be given to ambient conditions at the plant location, as these will affect the liquefaction technology options available to plant designers.

Moisture is animportant factor in growth of plants, and is defined as the ratio of water vapor in the air to the amount of water in the air. Waiting includes handling cost in waiting area, money tied up with idle material etc.

Instead of making one single product as in case of job production a batch or group of products is produced at one time, It should be remembered here that one batch of products has no resemblance with the next batch.

Layout should also suit the factory building. This method involves a continuous production of standardized products on large scale. Topography, shape, climate conditions, and size of the site selected will influence the general arrangement of the layout and the flow of work in and out of the building.

As feed and other refrigerants are cooled by ambient air more frequently, the loads on the propane compressor decrease. Direct seawater, as compared to indirect seawater, offers the highest efficiency and compactness through a wider temperature approach and fewer required heat exchangers and pumps.

It is that form of production where identical products are produced in batches on the basis of demand of customers or of expected demand for products. Layout plans differ according to the type of production.

There is a continuous or uninterrupted flow of production obtained by arranging the machines in a proper sequence of operations. The heat dissipated by working people is more than from sitting people.

They are required in smaller quantities by the plants. Main considerations are as follows: In contrast, the control system on aeroderivatives uses unbiased gas generator discharge temperature to approximate firing temperature. The conveyor should not be placed at an elevation of more than 20 degrees.

It shows the interrelationships and functions of the various components of the plant. These motors can negate ambient effects e. Aeroderivative turbines can be started from a compressor settle-out condition as they have multiple shafts, and they do require a large motor to start.Crushing & Screening Plant Design Factors These affect the power consumed at the drive motor and rate of energy input as follows.

At fixed settings (fig 5) near the point of economic operating capacity, feed rate versus power drawn has a linear relationship. Power rate tends to remain a constant.

The eight factors affecting plant layout are as follows: 1. Man Factor 2. Material Factor 3.

Plant Layout: Meaning, Factors and Tools

Machinery Factor 4. Movement Factor 5. Waiting Factor 6. Service Factor 7. Building Factor 8. Flexibility Factor. The eight factors affecting plant layout are as follows: 1. Man Factor 2. Material Factor 3. Machinery Factor 4. Movement Factor 5. Waiting Factor 6. Service Factor 7.

Building Factor 8. Flexibility Factor.

Factors that Affect HVAC Design: Heat Load Calculations

Whatever be the type of layout being contemplated, the following factors are to be considered. Factors Influencing Plant Location. Plant Layout. WORK STUDY (WORK MEASUREMENT & METHOD STUDY) of PRODUCTION TECHNOLOGY. Documents Similar To Factors Affecting the Layout Design.

Skip carousel. HISTORY OF Operations Management. Uploaded by. Aalam Khalili. Plant Layout. Uploaded by. 5/5(3). Top 10 Factors determining Product Design 1. Customer requirements: Product design has to give due respect to the requirements of customers.

What are the factors affecting product design? Update Cancel. ad by bistroriviere.com Organize your team's projects and work in one place.

Plant and machineries The product design.

factors affecting aggregate plant site selection

Facility Layout - Objectives, Design and Factors Affecting the Layout Introduction For an organization to have an effective and efficient manufacturing unit, it is important that special attention is given to facility layout.

Download
Factors affecting plant design
Rated 4/5 based on 43 review